Skip to content
Interpack 2029
SOL Germany · Düsseldorf

Exhibition Stand Builder for Interpack in Düsseldorf

Stands for Messe Düsseldorf, 10–15 June 2029 — built in our Frankfurt workshop and installed by our own crew. Planned around what a running packaging or processing line actually needs on the floor: three-phase power under load, compressed air, a floor engineered for the machine's weight, and a guarded demo zone the aisle can watch.

€4,500+From
500+Stands
15 YrsEurope
4.9Trustpilot4.9Google
Browse Designs
SOL Germany exhibition stand with a running packaging line for an Interpack exhibitor at Messe Düsseldorf
10–15 JUN 2029
Düsseldorf, Germany
10–15 June 2029Show Dates
Messe DüsseldorfVenue
TriennialCycle
Six days · Sun–FriNew Format
Early summerNew for 2029
Messe Düsseldorf GmbHOrganiser
Event Overview

Interpack 2029 — What Has Changed and What It Means

Interpack is the leading international fair for processing and packaging machinery, and its 2029 edition breaks a decades-old pattern: it moves to early-summer June and runs a tighter six-day week, Sunday to Friday. For anyone building a stand, both changes move the deadlines that matter — most published guidance still describes the old May schedule.

Interpack 2029 — At a Glance

Dates
10–15 June 2029 (Sunday to Friday), daily 10:00 to 18:00
Venue
Messe Düsseldorf — Halls 1 to 17 plus the temporary Hall 18
Cycle
Triennial, roughly every three years; the previous edition ran 7–13 May 2026
New in 2029
First June edition, and a six-day run in place of the seven days of recent editions
Sector
Processing and packaging machinery, materials and related technology for food, confectionery, bakery, beverage, pharmaceuticals, cosmetics and industrial goods
Organiser
Messe Düsseldorf GmbH
Scale
One of the largest fairs Messe Düsseldorf hosts, drawing exhibitors and visitors from across the world
Next after 2029
Expected around 2032, on the three-year cycle

Why Exhibitors Choose SOL Germany for Interpack

Interpack is a services build before it is a design build, but the services are not the ones most fairs turn on. A running line wants three-phase power under real load rather than for lighting, it usually wants compressed air for its pneumatics, and it wants a floor engineered to the machine's weight and to the load it puts down while it cycles. Those orders are position-dependent, deadline-bound, and placed with the venue separately from anything the designer draws — and they are the part first-time exhibitors most often leave until the design is signed off, by which point the deadline has passed.

The stand itself is built and assembled on our own floor in Frankfurt, photographed for approval, then driven roughly 230 kilometres north to Düsseldorf. Domestic road freight, no customs, no border on the stand, and a crew who have worked these halls before. One thing that is not domestic is the machine: your line ships on the exhibitor's own logistics, often from an OEM plant and often arriving in the final forty-eight hours, so we design the build around that window with a rear access route rather than assuming the machine is already there.

One further point that is specific to 2029. Interpack is triennial, so the stand you commission carries three years of brand impression rather than one, and if you intend to reuse the structure the gap is long enough that storage and a graphics refresh belong in the plan from the outset. And the new early-summer slot makes the outdoor grounds usable while making the halls warmer than the old May dates — which means heat dissipation around a running machine is a real design input, not an afterthought.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes.

From Our Project Managers

What We've Learned Building on the Interpack Floor

Practical notes from the SOL Germany team — the things the exhibitor manual does not tell you.

CD

The June Move Changes Build-Up, Not Just the Show Week

This is the 2029-specific one. A Sunday opening means build-up runs across a weekend, and the last productive build day is a Saturday rather than the mid-week finish the old May schedule allowed. Venue marshalling, delivery slots and hall traffic in an early-summer slot do not match the pattern that every older exhibitor guide and most competitor pages still describe. We plan the machine's commissioning for the Sunday morning, not for show-open, and we confirm the current build-up window with Messe Düsseldorf rather than reusing last edition's.

Compressed Air Is the Order People Forget

Packaging machinery runs on pneumatics, and the compressed-air supply is ordered from the venue separately from electrical, is position-dependent, and has a deadline that falls well before build-up. A line that will not cycle on press morning is far more often an air-pressure problem than a power one. We file the air order and the power order at the same time, against the machine's stated demand, so the line is fed before your team arrives to run it.

Floor Loading Is the Real Design Constraint

Continuous-motion machinery concentrates weight and puts down a dynamic load while it runs, not just the static weight on its data plate. The plinth and the load spreading are engineered to the machine's general-arrangement drawing, which we ask for before the stand is drawn rather than after. There is a second reason to see that drawing early: in a warmer June hall a machine under load needs air moving around it, so we design the enclosure to breathe rather than boxing the line into a dead-air corner.

The Machine Arrives Late and Large

The exhibitor's line commonly lands in the final forty-eight hours, and it is usually the largest single item coming onto the stand. Both facts point the same way. We design a removable rear panel and plan the access route so the machine goes in after the structure is standing, rather than building a stand around a machine that has not yet turned up and then finding it will not fit through the opening left for it.

A Live Demo Puts the Public Next to Moving Machinery

The aisle-facing running line is the single biggest draw on an Interpack stand and its single biggest liability. Guarding, emergency stops and a defined demonstration zone with a barrier line are designed in from the start, and the sightline is set so a visitor can watch the line form, fill or seal without being able to reach into it. A demo that pulls a crowd and a demo that is safe with a crowd around it are the same design problem solved once.

Triennial Means a Three-Year Asset and Stale Floor Knowledge

The last Interpack ran in May 2026, so by June 2029 the hall plan, your neighbours and the traffic pattern will have moved, and because the June slot is brand new nobody's edition memory quite applies. We design to the current hall plan and the current stand number, not to where the show used to be. And because the next edition is three years out, the build is a three-year brand asset — which usually justifies spending on a structure that will still read well at the edition after this one.

Transparent Pricing

What an Interpack Stand Actually Costs

Pricing here follows the machine more than the styling. A stand with a running line — three-phase power under load, compressed air and a floor engineered for the weight — costs more to build than the same floor area with a display case, and that is the honest driver behind the brackets below.

Essential — 9–18 m²

From €4,500
Best for: materials, consumables and component suppliers, distributors, and exhibitors attending Interpack for the first time without a running line
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Product shelving or a small display case
  • Graphics design and print (two revision rounds)
  • Frankfurt → Düsseldorf road freight
  • Installation, dismantling and organiser paperwork

Not included: three-phase machine power, compressed air, reinforced plinth, enclosed meeting room.

Premium — 60–150+ m²

From €34,000
Best for: full-range machinery OEMs, exhibitors running several lines, brands treating Interpack as their flagship for the three-year cycle
  • Architectural custom build, optional double-decker for meetings above the machinery footprint
  • Multiple guarded demonstration positions with independent three-phase and air
  • Heavy-load flooring engineered for packaged plant
  • Enclosed meeting rooms and a hospitality area that uses the early-summer outdoor aspect
  • Hanging sign where the hall permits
  • Full AV package and product demonstration stations
  • Technical back-of-house and storage
  • Priority workshop build slot

Not included: floor space rental, rigging fees, AV hire beyond the package, catering, machine freight.

Recent Builds

Stands We Have Built

Stands delivered across German and European processing, packaging and industrial trade fairs.

A Guide to Interpack for First-Time Exhibitors

Interpack is the leading international fair for processing and packaging machinery, and the 2029 edition runs 10–15 June at Messe Düsseldorf, Sunday to Friday, from 10:00 to 18:00 each day. It is held roughly every three years, is organised by Messe Düsseldorf, and its previous edition ran 7–13 May 2026 — so anyone working from the last show's calendar is working from May dates that no longer apply.

Two things about the 2029 edition change the plan before you draw a line. Interpack moves to early summer for the first time, which makes the outdoor grounds usable and the halls warmer than the old May slot. And it runs a compact six-day week rather than the seven days of recent editions, opening on a Sunday — which pushes build-up across a weekend and shifts the delivery and commissioning schedule. Neither change is cosmetic; both move the deadlines that a stand build is planned against.

Who Exhibits at Interpack and What Visitors Come to Buy

The floor covers packaging and processing machinery, packaging materials, and the related printing, labelling, storage and logistics technology that feeds a production line. Exhibitors range from materials and component suppliers through to the machinery OEMs whose stands are among the largest on the fairground. The visitor is a packaging engineer, a production or operations manager, a procurement specialist or a technical buyer working in confectionery, bakery, beverage, food, pharmaceuticals, cosmetics or industrial goods — people evaluating capital equipment, not impulse purchases.

That audience comes to see machines run. They will want to watch a line form, fill and seal at speed, ask about changeover time and throughput, and understand serviceability before they shortlist a supplier. It is worth knowing where Interpack sits among the packaging fairs: it is the machinery-and-processing end of the sector, where FachPack in Nuremberg leans toward packaging materials and consumer packaging. A stand that lets a buyer see the line running, and gives them somewhere to sit and talk numbers afterwards, does the qualifying work here.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for materials, consumables and component suppliers whose product is physically small or is essentially a specification. You get a counter, a back wall and standing conversations. What you cannot do at this size is run a line with any circulation around it.

Eighteen square metres suits distributors and specialists who need a display and a proper conversation, and it is the largest size we would attempt without a serviced running-line position.

Twenty-four is the threshold at which a running line becomes practical: enough floor for the plinth, the power and air runs, a guarded demonstration zone, and a route for visitors to walk around the machine rather than past it. If you intend to demonstrate a line at all, treat 24 m² as the working minimum.

At 48 m² you can service two demonstration positions and still hold a private conversation, which matters when a buyer wants to discuss a project rather than a single machine. From 80 m² upward, a double-decker adds meeting and hospitality capacity above the machinery footprint without consuming the ground-floor area the line and its safety zone need — and on this floor that ground-floor area is at a premium.

What an Interpack Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, domestic freight, install and dismantle. They exclude the floor space rental you pay to Messe Düsseldorf, the electrical, air and water orders placed with the venue, and the machine itself with its freight.

  • 9 m² modular: €4,100–€8,700
  • 18 m² modular: €4,800–€10,100
  • 24 m² custom with one running-line position: €11,500–€15,000
  • 30 m² custom with enclosed meeting room: €15,000–€19,000
  • 48 m² custom with two demonstration positions: €19,000–€26,000
  • 80 m² premium or double-decker: €34,000–€48,000

What the 2029 Date Change Means for Your Plan

This is the part most guidance gets wrong, because most guidance still describes the May schedule. Interpack 2029 opens on Sunday 10 June and closes on Friday 15 June — six days, in early summer. The organiser has framed the move as a response to what exhibitors and industry associations asked for: a tighter, more efficient format, and a slot when the outdoor grounds and plazas are pleasant enough to work as informal meeting space alongside the halls.

For a stand build, three consequences follow. Build-up now runs across a weekend, so your last build day is a Saturday and machine commissioning falls on the Sunday morning before doors — the crew rota and the delivery slots have to be planned to that, not to a mid-week finish. The halls run warmer than they did in May, so a machine under load needs ventilation designed around it rather than an airtight enclosure. And the usable outdoor aspect means a hospitality or outdoor-facing element earns its floor space in June in a way it would not have in the old slot. If you are reusing a brief written for a previous Interpack, check every date in it against the 2029 schedule before you rely on it.

Common Mistakes, in Order of Frequency

The most common is forgetting the compressed-air order, which is separate from power, deadline-bound, and the usual reason a line will not cycle on press morning. The second is underspecifying the floor, because the machine's dynamic load while it runs exceeds the static figure on its plate. The third is building the stand around a machine that arrives last, then finding it will not pass through the opening left for it. The fourth is an aisle-facing demonstration with no guarding, e-stops or barrier line — a crowd-puller that becomes a hazard the moment it draws a crowd. The fifth is planning to the May 2026 layout and calendar, neither of which applies in June 2029. The sixth is boxing a running machine into a sealed enclosure in a warm June hall, so it overheats mid-demonstration. All six are settled at design stage or not at all.

Getting Started

Send your stand size, your hall and stand number if Messe Düsseldorf has issued it, and the machine list — footprint, weight, power draw, compressed-air demand, and whether it runs live on the stand. That last detail changes the design more than anything else you can tell us, because it decides the plinth, the services and the safety zone. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

For the materials, consumables and component exhibitors who do not run a line, the three-year gap between editions makes a reusable modular system the sensible buy — the structure waits in our Frankfurt warehouse between shows and the next Interpack costs a graphics refresh rather than a rebuild. Our modular exhibition stands are built for exactly that pattern.

FAQ

Interpack 2029 — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is Interpack 2029?

Interpack 2029 runs 10–15 June 2029 at Messe Düsseldorf, Sunday to Friday, from 10:00 to 18:00 each day. It is organised by Messe Düsseldorf and held roughly every three years. The previous edition ran 7–13 May 2026, so 2029 is both the first June edition and a six-day run in place of the earlier seven days.

Why has Interpack moved to June?

The organiser rescheduled the fair to early summer and tightened it to a six-day Sunday-to-Friday week after consulting exhibitors and industry associations, with the stated aim of a more efficient format. Early summer also makes the outdoor grounds usable as informal meeting space. For exhibitors the practical effect is that build-up now spans a weekend and the halls run warmer than they did in May.

How much does an Interpack stand cost?

From €4,500 to around €52,000 depending on size and services. A modular 18 m² sits in the €4,800–€10,100 range. A 24 m² custom stand with one running-line position is typically €12,000–€16,000. A 48 m² with two demonstration positions runs €19,000–€27,000. Premium and double-decker builds from 80 m² start around €34,000.

What is not included in the price?

Three things. The floor space rental, which is between you and Messe Düsseldorf. The electrical, compressed-air, water and rigging orders placed with the venue. And the machine or line itself, with its freight — that ships on your own or your OEM's logistics, separate from the stand.

Can the stand support a running packaging or processing line?

Yes, and it is the normal case here. We engineer the plinth to the machine's real footprint and dynamic load, design the three-phase supply and compressed air into the build, plan a guarded demonstration zone, and leave a removable rear panel so the machine can be positioned after the structure is up rather than being walled in.

Do I need compressed air?

If your line is pneumatic — most packaging machinery is — then yes. Compressed air is ordered from the venue separately from electrical, it is position-dependent, and its deadline falls well before build-up. Tell us the machine's air demand at briefing stage and we file it alongside the power order.

How heavy a machine can the floor take?

The stand floor is engineered to the machine, not the other way round. Send us the machine's general-arrangement drawing with its footprint, static weight and the dynamic load it puts down while running, and we spread that load and reinforce the plinth accordingly. The earlier we see the drawing, the cleaner the design.

My machine arrives at the last minute — can you work with that?

Yes. It is the usual case, so we plan for it. We design a removable rear panel and an access route so the line goes in after the structure is standing, and we schedule the build so the stand is ready to receive the machine in the final forty-eight hours rather than being blocked by its absence.

How do you handle a live demonstration safely?

Guarding, emergency stops and a defined demonstration zone with a barrier line are designed in from the start. The sightline is set so a visitor can watch the line form, fill or seal without being able to reach into it. The stand's biggest draw and its biggest liability are the same thing, so we solve them together.

Is there customs to pay on the stand?

No. Düsseldorf is domestic for us. We build in Frankfurt and drive roughly 230 kilometres north, so there is no customs file and no border on the stand itself. A machine you import from outside the EU is separate and stays on your own logistics.

Which hall will I be in?

Hall and stand allocation is set by Messe Düsseldorf; the fair occupies Halls 1 to 17 plus the temporary Hall 18. We design to your current stand number and the current hall plan — and because the last edition was three years and one venue-reorganisation ago, we do not assume the layout matches your memory of 2026.

Do you handle the organiser paperwork?

Yes — electrical, compressed-air, water and rigging orders, waste removal, daily cleaning and crew passes. We file on the day a contract is signed, because the services deadlines fall well before build-up and they are the ones that cannot be recovered late.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a running line takes one to two days plus commissioning time for the machine. Premium builds use the full window. Every stand is pre-assembled at our Frankfurt workshop first.

When do I need to lock the design?

Earlier than for an ordinary show. The services orders and the machine list bind before the styling does, so for a June show we want the machine list and the power and air demand in by late winter — the venue orders cannot wait for a design decision, and at a triennial fair there is no second run at it next year.

How often is Interpack held?

Every three years — it is triennial. The 2029 edition on 10–15 June is the next one; the previous edition ran in May 2026. On the same cycle, the edition after 2029 is expected around 2032. The long gap is one reason a stand here is worth treating as a three-year brand asset rather than a single-show build.

Can I reuse the stand at the next Interpack?

Yes, if it is built on a system frame. We store the structure in Frankfurt and refresh the graphics for the next edition. Given the three-year cycle the graphics will almost certainly need updating anyway, but the frame, the plinth engineering and the services layout carry over.

Does the warmer June slot change anything for the stand?

Yes, in two ways. A machine running under load in a warmer hall needs air moving around it, so we design the enclosure to breathe rather than sealing the line into a hot corner. And because the outdoor grounds are pleasant in early summer, a hospitality or outdoor-facing element earns its floor space in June in a way it would not have in the old May slot.

Do you build at other Düsseldorf shows?

Yes — Aluminium Düsseldorf, ProWein, K and others, among the heavy-industry and materials fairs on this fairground. Same crew, same route from Frankfurt. Interpack is the packaging-machinery fair among them, so if you exhibit across several Düsseldorf shows we can plan the builds together.

How do I start?

Send your stand size, your hall position if you have it, and the machine list including footprint, weight, power draw and compressed-air demand. You get a 3D design and a full itemised quote back, at no charge.

Ready to Exhibit

Get Your Interpack Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items, domestic freight and no customs — with the three-phase power, compressed air and floor loading planned before the design is drawn.

48hrFree 3D Design
€4,500+All-Inclusive
28 daysTo Show Floor
4.9Trustpilot4.9Google
WhatsApp us
WhatsApp us