Skip to content
Exhibition stand design and build across Europe
SOL Germany · Berlin

Exhibition Stand Builder in Berlin

Design, build and on-site supervision for exhibitors at Messe Berlin, the City Cube and the converted venues the city uses across Kreuzberg and Neukölln — on a ground where the hall you land in sets how tall you can build and what you can hang.

€4,500+From
500+Stands built
15Years in Europe
WhatsApp us
Exhibition Stand Builder in Berlin
Berlin
Messe Berlin under the FunkturmVenue
Widely mixedHall character
ITB BerlinHeadline fairs
€4,500+From
Why this city

Why the hall you're in decides the Berlin build

At a glance

Venue
Messe Berlin under the Funkturm — the numbered halls plus the City Cube; Station Berlin, Arena Berlin and the Estrel as secondary grounds
Hall character
Widely mixed — the City Cube is clear-span and tall; several numbered halls are lower with structure overhead
Headline fairs
ITB Berlin, IFA, InnoTrans, Fruit Logistica, Grüne Woche, Bread & Butter
Stand sizes that suit
12–40 m² in the older halls; 60 m²+ where the City Cube's height can be used
Lead time
6–9 weeks for custom; faster on modular
Pricing from
€4,500 Essential / €11,500 Custom / €34,000 Premium

How we work it

Berlin's main ground sits under the Funkturm in Westend — a complex of halls of very different ages, from the older numbered halls to the glass-and-steel City Cube. The build rules and rigging points are not consistent across them, which is the single thing most out-of-town exhibitors get caught by. A stand designed for City Cube's clear-span volume will not drop straight into one of the older low-truss halls without rework.

That variance is why Berlin rewards settling the hall before the design. The City Cube was built as a single clear-span volume with real roof height and a proper rigging grid, so a stand there can carry a raised fascia, a suspended ring or a lighting bridge and still read from three aisles away. The numbered halls around the Funkturm were built to other decades and other logics — lower roofs, more structure in the way, fewer usable hang points — and a design drawn for the Cube arrives there needing to be cut down. Add the converted buildings the city uses for its fashion, design and tech events, where the room was never a hall at all, and the address on your contract genuinely changes the brief.

On the ground

What changes a Berlin build, hall by hall

A few things that decide a Berlin build:

Hall variance

City Cube takes tall, open, rigged stands cleanly; the older halls cap your height and limit hanging points. Confirm the exact hall before the design is locked, not after.

Load-in routing

Messe Berlin's marshalling runs off the Westend side; build and dismantle slots are tight around the big shows (ITB, IFA, InnoTrans) and overrunning a slot costs real money.

Power ordering

Power is ordered through the venue ahead of the show, not improvised on site — under-ordering is the most common day-one failure.

Floor

The newer halls run sealed screed; older surfaces elsewhere on the ground are less even, so levelling under a raised platform is a hall-by-hall question rather than a standard allowance.

House rules at the secondary venues

Station Berlin, Arena Berlin and the Estrel are converted buildings rather than purpose-built halls — ceiling structure, permitted fixings and how close a vehicle can get to the door all differ from Messe Berlin's own conditions. Read the venue's technical manual, not the fair's.

From the floor

What the hall decides

Carlos Dalè, our General Manager, has run build-ups across the German circuit. His notes on Berlin:

CD

The City Cube versus old-hall question is not cosmetic. I have seen a rigging plan signed off for a clear-span hall and then re-drawn in a week because the actual hall capped the hang points. Get the hall number on the contract before the design is final.

Around ITB and InnoTrans the marshalling yard backs up and the build window tightens across the whole ground. I book the slot early and work the stand back from it, because arriving into a queue costs you the first half-day of build and you never get it back.

Under-ordered power is the classic day-one scramble in Berlin. I would rather over-spec the supply by a margin and hand back capacity than chase an electrician at 7am on opening morning.

Pricing

What a stand costs

Ranges below are build cost in euros. They exclude stand space rental (paid to the organiser), local taxes, and travel/accommodation for your own staff.

Essential — 9–18 m²

From €4,500
Best for: first-time exhibitors, distributors and component suppliers who need a clean, professional presence without a bespoke build.
  • Modular aluminium frame, designed and specified in Frankfurt
  • Backlit fabric back wall, full height
  • One branded counter — reception or product-display format
  • Standard LED top-rail lighting
  • Pre-assembly and photography at the Frankfurt workshop
  • Delivery, installation and dismantle handled by us, anywhere in Europe
  • Installation and dismantle by our own crew
  • Graphics design and print (two revision rounds)

Not Included (Optional): floor space rental, local taxes, furniture beyond the counter, catering, stand staff.

Premium — 50–100+ m²

From €34,000
Best for: headline exhibitors taking a large plot, hosting scheduled meetings and running several demonstrations at once.
  • Architectural custom build, optional two-level structure
  • Multiple enclosed meeting rooms
  • Heavy-load flooring checked against the hall specification
  • Several serviced demonstration positions with independent power
  • Hanging sign where the hall permits
  • Delivery, installation and dismantle handled by us, anywhere in Europe
  • Full AV package and product demonstration stations
  • Technical back-of-house and equipment storage bay

Not Included (Optional): floor space rental, rigging fees, AV beyond the package, catering, translation or interpreter services.

Our work

Recent stands

venue-matched: itb-berlin footage -->
On film

Stands we have built

A stand we designed and built at this venue, filmed on the show floor.

Full guide

A practical guide to exhibiting in Berlin

Start with the hall, then the design

The most useful thing to settle before anything else on a Berlin stand is which hall you are actually in. Messe Berlin's ground is not one consistent building; it is a collection of halls built across decades, and they differ in ceiling height, structural grid and what you are allowed to hang from above. The modern City Cube behaves like a clear-span volume — you can build tall and rig generously. The older numbered halls cap your height and limit your hanging points, which quietly rules out a whole class of designs.

Designing before the hall is confirmed is the most common avoidable cost on a Berlin project. A render approved for an open hall can need a week of rework once the real hall turns out to be a low-truss one. We ask for the hall number on the contract precisely so the design starts inside the right envelope rather than getting cut down to fit it later.

Rigging is the constraint that reshapes designs

Overhead rigging — a hanging banner, a suspended logo ring, a lighting grid above the stand — is where Berlin's hall differences bite hardest. In the older halls the available hang points are fewer and lower, and the venue's rigging rules are stricter than the open halls suggest. A design that leans on a big suspended element to carry its identity can lose that element entirely if the hall will not take it.

The practical move is to decide early whether your stand's identity depends on anything overhead. If it does, that is the first thing to confirm against the specific hall. If it does not, you have more freedom across halls and the design travels more easily if you reuse it. Either way, the rigging question is settled at design stage, not discovered on build day.

Beyond the Funkturm: Berlin's secondary venues

Berlin does not put all its trade events on one ground. Alongside Messe Berlin in Westend, the city runs fairs and brand events out of converted industrial buildings — Station Berlin, a former goods depot in Kreuzberg; Arena Berlin on the Spree; the Estrel in Neukölln. These carry a different kind of event: fashion weeks, design fairs, tech conferences, launches that want the room itself to have character rather than a neutral hall around them.

They also carry different technical conditions. A converted building has the ceiling it was born with, so anything overhead is limited to what the original structure will take and fixings are often restricted outright. Access is rarely a clean drive-in — more usually a door, a lift and a corridor, which caps the size of any single element you can bring in already assembled. A stand for Station Berlin is designed around those dimensions from the first sketch, and it pays to read that venue's own technical conditions rather than assume the fair's general rules apply.

Build-up and dismantle: where the Berlin slots bite

Berlin's biggest shows — ITB for travel, IFA for consumer electronics, InnoTrans for rail — fill the ground and compress the build and dismantle windows. The marshalling yard backs up, the access routes get busy, and a slot you overrun is a slot someone else is waiting for. Build-up discipline is not a nicety here; it is the difference between opening on time and opening flustered.

The practical answer is to work backwards from the booked slot rather than forwards from the show date. Berlin's access routes off the Westend side funnel a lot of halls through a small number of gates, so the difference between an early slot and a late one is measured in hours of standing still. Dismantle behaves the same way in reverse, and it is the point at which tired crews and a full yard produce most of the avoidable damage on a Berlin stand.

Custom or modular for a Berlin stand

If Berlin is a one-off appearance and you do not expect to exhibit again soon, a modular Essential stand is usually the honest call over a custom build you will store and never reuse. It costs less, ships easily, and does the job for a single show. We will say so rather than push a custom build you do not need.

If Berlin is part of a wider German or European programme, the calculation flips. A custom or reusable modular stand designed from the start to break down and re-ship can run Berlin, then Munich, Cologne or Düsseldorf across a season, with the per-show cost falling each time you reuse it. The decision is really about how many times the structure will be used, and we would rather have that conversation honestly up front than sell a stand that sits in storage.

Who carries the risk on build day

The design matters, but the design is the easy part of a Berlin stand. The hard part is a hall slot that holds, power that was ordered correctly, freight that arrives intact, and a crew on site who has worked the Berlin halls before. Exhibitors who choose a builder purely on the render sometimes discover that gap on the show floor, when there is no time left to close it.

On this ground the questions that decide whether a stand opens on time are all venue questions: which hall, what it will take overhead, whether the power was ordered against the venue's deadline, and whether the slot holds. A render answers none of them. Exhibitors who settle those four early tend to spend build week finishing a stand; the ones who leave them open spend it renegotiating with the hall.

Power, services and the ordering deadlines

Power is the most common day-one failure on a Berlin stand, and almost always because it was under-ordered. Power at Messe Berlin is ordered through the venue ahead of the show against fixed deadlines, not improvised on the morning, and the supply you book has to cover everything that draws current — lighting, screens, any demo equipment, catering points — with a sensible margin on top. Working that load out accurately at design stage, against real figures for every screen, light and demo unit, is what keeps opening morning calm.

We treat the services order — power, and where relevant water, compressed air or rigging points — as a checklist tied to the venue's deadlines, and we would rather over-specify the supply slightly and hand capacity back than find a stand a few amps short with no time to fix it. The same discipline applies to internet and any AV the stand depends on. None of this is glamorous, but it is the part of a Berlin build that quietly decides whether day one runs smoothly or starts with a scramble.

Dismantle, storage and the second outing

The end of a Berlin show is where most of the avoidable damage happens. The dismantle window on the big fairs is short, the yard fills, and every hall on the ground is trying to get out through the same gates at once. A structure pulled apart in a hurry comes back needing repair before it can run again, which quietly turns a reusable stand into a one-off. Dismantle is planned with the same care as build — a labelling system, protected finishes, and a packing order that follows the load-out sequence rather than the build sequence.

If Berlin is the first of several German outings, that first dismantle sets up everything after it. Berlin's hall variance is in fact an argument for a stand designed to flex: a structure that can stand tall under the City Cube and reconfigure lower for a numbered hall will also cope with Munich's Riem halls or Cologne's stacked levels without a redesign. Building that adaptability in at the start — clean break-down points, a height that can be dropped, graphics sized per hall rather than once — is what makes reuse genuinely economical instead of a structure that degrades a little at every show.

Graphics, print and the hall's dimensions

Because Berlin's halls differ so much in height and proportion, the large-format graphics are sized to the specific hall rather than to a standard template. A graphic wall designed for the tall City Cube can be the wrong proportion entirely for a lower numbered hall, and the highest graphic line — the one that pulls visitors from down the aisle — depends directly on how much height the hall actually gives you. Confirming the hall before the print files are finalised avoids reprinting at the last minute.

We prepare the print artwork once the hall and the structure are locked, so the graphics fit the real dimensions and the brand reads cleanly at the size it will actually appear. Print has its own lead time, and a late hall change that forces a reprint is both a cost and a schedule risk, so it is one more reason the hall confirmation comes first on a Berlin stand. Getting the graphics right for the room is part of making the design work at the distances a Berlin hall is read from.

FAQ

Frequently asked questions

Do you work at Messe Berlin and the city's other venues?

Yes — the numbered halls and the City Cube at Messe Berlin, plus the converted venues Berlin uses for its fashion, design and tech events. Design work starts from the specific venue's technical conditions, because they differ sharply across the city.

How much does the hall I'm in affect the design?

A great deal. City Cube takes tall, rigged stands; the older numbered halls cap height and hang points. Confirm the hall before the design locks — it sets the envelope you design inside.

Can I hang a banner or logo ring above my Berlin stand?

In the open halls, usually yes; in the older halls, hang points are fewer and lower, and the rigging rules are stricter. If your identity depends on something overhead, that is the first thing we confirm against your specific hall.

What happens around the big Berlin shows like ITB or IFA?

Build and dismantle windows tighten and the marshalling yard backs up. We plan against your booked slot and stage the freight to hit it, rather than arriving into a queue.

How much height do I actually get in a Berlin hall?

It depends entirely on the hall. The City Cube is a clear-span volume with real height and a rigging grid; several of the older numbered halls are considerably lower with structure overhead. Confirm the hall number before the design locks.

Can we reuse the stand at another German show?

Yes — a modular build is designed to be reconfigured and re-shipped to Munich, Cologne, Düsseldorf and back. Whether that is worth it depends on how many shows you will use it for, and we will be honest about that.

Who supervises the build on site?

Your project lead is in Berlin for build and dismantle, not just reachable by phone.

Ready to exhibit

Tell us the show and the hall

Send the show name, your stand size and the hall if you have it. You get a design direction and an honest price range back — not a brochure.

WhatsApp us
WhatsApp us