Where SOL Germany comes from
Before there was a company, our founders were on exhibition floors across Europe, Asia and the Middle East — drawing stands, cutting timber, wiring lighting and standing on site through build-up. Those years taught us where exhibition projects actually go wrong, and it is almost never the design. It is a stand that renders beautifully but cannot be built in the time available. It is a workshop that misses the crating deadline. It is an exhibitor chasing five separate suppliers the week before doors open, discovering that nobody owns the problem.
So the company was built on one rule: keep everything under one roof. Our own designers, our own carpenters and metalworkers, our own printers and site supervisors. When the same team that designs a stand also builds and installs it, accountability cannot get lost in a handover — there is nobody to hand it to.
Today we build everything from a 9 m² modular booth to a double-decker custom stand. The method has not changed: every project is pre-built and checked before it ships, and every client has one project manager from first brief to dismantle.
We also say no. If a brief needs a specialism we do not have in-house, or a timeline genuinely cannot be met to the standard we would put our name on, we say so and point you somewhere better. A stand delivered late or half-right costs an exhibitor far more than the build ever did.














